Parishwide Proposition (Tax Renewal) Summary: 10-year 4.27 mill property tax renewal for constructing and maintaining necessary levees, levee drainage, flood protection, hurricane flood protection and all other purposes incidental thereto in the Lake Borgne Basin Levee District.
PW Lake Borgne B.L. Dist., 4.27 Mills - BOC - 10 Yrs.
Passed: 74.1% voted yes and 25.9% voted no.
By precinct in St. Bernard Parish
The precinct map loads as you scroll to it.
Which side won each precinct, and by how much
| Under 55% | 55 to 65% | Over 65% | |
|---|---|---|---|
| Yes | |||
| No |
- A tie
- Not voting in this race, or no votes
Shows the 617 votes cast at the polls in 36 precincts. The 29 early and absentee votes are counted for the whole parish, not by precinct, so they aren't on the map.
646 votes cast.